Warranty Policy - D3 Design Build LLC (00661576-2)
The Builder will fix or repair (at Builder’s option) any Ordinary Defect or Latent Defect reported by the Buyer to Builder in the manner required by Section 3 within the first ninety days of occupancy by the Buyer (the “Ordinary Defect Warranty Expiration Date”). ... Fetch This Document
Structural Solutions For Small Bump-outs - STUDIO HAMLET
Structural Solutions for Small ometimes you don’t need an entire room to make a floor plan work. Sometimes all you need is a few feet. But sometimes you’re in a situation where adding a few feet to a home’s footprint will throw off its style, crank up project costs, or put the owners on the wrong side of local zoning rules. ... Retrieve Here
PROPRIETARY Simulating The Energy Performance Of A Foam Roof ...
Simulating the Energy Performance of a Foam Roof System: Final Report Abstract Annual residential simulations were run in 13 US cities to determine the energy savings of using an ... Access Doc
The Port Townsend Historic Building
Port Townsend’s historic buildings which are part of the Main Street Architect/Engineer/Builder, constructed this two-story sandstone building in 1881 at a cost of $50,000. Built in the Federal Style, E.H. Fisher of Seattle. ... Read Full Source
What You Need To Know About Custom Construction Financing.
What you need to know about custom construction financing. the builder, the plan, the materials and the financing. That’s a lot of choices and a lot of “i’s” that need to be dotted and “t’s” that need to be garage and attic. Space to entertain. ... Access This Document
FAIRA TRANSPARENCY REPORTS 3019 SW Morgan St, Seattle, WA ...
FAIRA TRANSPARENCY REPORTS 3019 SW Morgan St, Seattle, WA 98126 March 14, 2016 Thank you for your interest in this Faira Certified home. We have coordinated the efforts of certified and licensed inspection and title professionals to create the Faira Transparency Reports for this home. ... Read Content
CARBON MONOXIDE ALARM REQUIREMENTS IN WASHINGTON STATE
Washington State Fire Code (WAC 51-54) Section 907 requires CO alarms in R-1, R-2 and R-3 where fuel-fired appliances or an attached garage are present. CO alarms are required by January 1, 2011 for new construction. CO alarms are required by January 1, 2013 for existing sleeping and dwelling units. ... Return Doc
Washington State Energy Code HVAC Requirements
Leakage & Energy Loss The hole needs to be connected to the outside Heat loss is proportional to temperature and pressure differences Holes that see high pressures and high temperature differences are most important for energy savings Heating Climates this is the supply side near the air ... Return Document
Bill Gates's House - Wikipedia
That garage alone can park 10 cars. Some of the concrete was purposely broken to give it a rough, "deconstructivist" look. As well as the Gates family's 4-car private garage built into the earth right by the 'family wing' of the home; there is a tree that Gates has monitored 24-hours a day. ... Read Article
Maximum Lot Coverage - Centralpt.com
Maximum Lot Coverage with rear garage and front porch 48% 53% 63% 73% 3. Existing main and accessory structures that are not in conformance with these coverage requirements on September 1, 2006, are permitted to be rebuilt within the building footprint as it existed on September 1, 2006, if ... Return Doc
JayMarc Homes Presents: The San Tropez Basement - YouTube
JayMarc Homes is a luxury home builder specializing in move-in ready and custom homes in the Greater Seattle area. The San Tropez basement home design is 4,812 sq. ft. with a 3-car garage, 5 beds ... View Video
Department Of Permitting And Environmental Review (Permitting)
Encouraged to contract with an engineer or builder who is familiar with King County requirements. For additional information, see Bulletin 6, Seattle & King County (206-296-4932). Electrical permits are issued by the Washington State ... Read More
TC Legend Homes - US Department Of Energy
TC Legend Homes Montlake Modern Seattle, WA zero energy home builder Ted Clifton of TC Legend Homes, who built them a modern two-story with a mother-in-law suite and views of Lake Washington from the roof-top deck. Clifton calls the home a positive energy home, one that up in the garage. ... Fetch Doc
Way To Grow - Seattle Tilth
Way To Grow is the bi-monthly newsletter of Seattle Tilth. Readers are encouraged to submit article ideas and photos c/o the editor at the address above or to tilth@seattletilth.org. Seattle Tilth reserves the right to edit submissions for interest, length and style, and print them as space allows. Printed with soy-based ink on forest friendly ... Retrieve Full Source
Chapter 4: Insulation - WSU Energy Program
WSEC Builder’s Field Guide, 8th Edition, 2009 • Washington State University Extension Energy Program Chapter 4-1 Chapter 4: Insulation In the Washington State Energy Code (WSEC), insulation levels expressed in R-values are determined by the com- ... Read Full Source
Electric Service Conversion Overhead-to-Underground
Overview and process of converting residential overhead electric service to underground (Up to 400 amps/self contained meters) Overview Xcel Energy conversion charges* Base charge $340 per service conversion Footage charge $6.50 per foot of wire from the pole to the meter socket. This is regardless the method of install. ... Read Content
Attic Access Solutions For The New Building Codes - Battic Door
Attic Access Solutions for the New Building Codes Mark D. Tyrol Mark D. Tyrol, ,P.E. 508.320.9082 ... Doc Retrieval
ESTIMATED COSTS OF THE 2018 IRC CODE CHANGES
Cost to builder includes overhead and profit (designated in the tables as “w/O&P”) applied to individual component costs (i.e., materials and labor) to represent the cost charged by the sub-contractor. ... Retrieve Here
KeyArena - Wikipedia
KeyArena (formerly Washington State Pavilion, Washington State Coliseum and Seattle Center Coliseum) is a defunct multi-purpose arena in Seattle, Washington that is currently under redevelopment. It is located north of downtown in the 74-acre (30 ha) entertainment complex known as Seattle Center, the site of the 1962 World's Fair, the Century 21 Exposition. ... Read Article
Lighting - Building Energy Codes Program
The latest in researched lighting loss factors and lighting design principles. This helps ensure that LPD values in properly applied energy codes and standards will provide sufficient power to accommodate quality lighting in buildings. Because building lighting is commonly considered one of the easiest energy uses in which to ... Return Doc
No comments:
Post a Comment